Create a new plan in Plan overview
Navigate to Plan overview: Access the Plan overview from the RigBridge environment.
Choose Your View: Select your preferred view (can be Field or Rig) from the drop-down menu. If your desired well is not listed, you can add it through the Well configuration, if you have permissions.
Select the Well: Identify and select the appropriate well where you want to add the plan.
Select or add an Event: If the desired event is not listed
Add Event, select the correct event code and give it a title.Select or add a Phase: If the desired phase is not listed, click
Add Phase, select the correct phase code, and assign it a title.Add a new plan: In the section view, select the option
Add plan.Name the plan and assign a workgroup: Provide a name for the new plan (e.g., "Drilling 8 1/2 section") and specify a workgroup e.g. MAIN or AUX.
Plan created: This will create a basic version of the plan that you can further edit in the Plan Editor.