Skip to main content

Copy a plan from RigBridge 2.7

1.

Is it possible to copy one or several entire plans from RigBridge 2.7 to RigBridge 3?

It is possible. Follow these steps:

  1. In RigBridge 2.7 select the plan(s) you want to copy and type [Ctrl + C].

  2. A banner shows confirming the selection is copied to the clipboard.

  3. In RigBridge 3 navigate to the required section you want to add a plan.

  4. Click on the Icon - paste Paste icon to paste the plan(s) (next to the Add plan).

After following these steps, your plans will now show in RigBridge 3.